Permitted Development Extension Rules 2027: How Big Can You Build?

Under England’s permitted development extension rules, a typical single-storey rear addition can usually go 3 metres beyond the original rear wall on a terraced or semi-detached house, or 4 metres on a detached house — without a full planning application. Larger rear extensions of up to 6 metres (other houses) or 8 metres (detached) may still be permitted development, but only after the larger home extension prior approval process. Use the Home Extension Calculator to size the build once you know which route you are on.

Work out your own numbers with our Home Extension Calculator.

Home Extension Calculator
Advertisement

Permitted development extension limits (England)

These rules apply to England under the Town and Country Planning (General Permitted Development) (England) Order 2015 (as amended), Schedule 2, Part 1, Class A. Scotland, Wales and Northern Ireland have different systems. Always check your local planning authority and any Article 4 direction before you dig foundations.

For a single-storey rear permitted development extension, the Planning Portal and GOV.UK technical guidance still use these depth limits measured from the rear wall of the original house:

House typeStandard PD rear depthLarger rear (prior approval)Max height
DetachedUp to 4 metresOver 4 m up to 8 m4 metres
Semi-detached, terraced, end terraceUp to 3 metresOver 3 m up to 6 m4 metres

Figures above are the current Planning Portal / GPDO position as of November 2026. “Original house” means the house as first built, or as it stood on 1 July 1948 if built earlier. A previous owner’s extension counts against your remaining depth.

Single-storey rear extensions within the 3 m / 4 m band are not subject to the neighbour consultation scheme. Once you go beyond those depths (but stay within 6 m / 8 m), you must use larger home extension prior approval before works start.

Larger home extension prior approval

Prior approval for a larger home extension applies only to single-storey rear extensions that extend beyond the original rear wall by:

  • Detached: over 4 metres and up to 8 metres.
  • Any other house: over 3 metres and up to 6 metres.

It is not available on Article 2(3) land (conservation areas, National Parks, the Broads, AONBs, World Heritage Sites and certain other designated areas) or on Sites of Special Scientific Interest. In those places the larger 6 m / 8 m route does not apply — you fall back to the tighter limits or full planning permission.

  1. Notify the council before work starts. Apply online via the Planning Portal for “Prior Approval: Larger Home Extension”. You cannot do this retrospectively.
  2. Include the required details. Written description with rear projection, eaves height and overall height; a site plan; addresses of adjoining premises; and the fee.
  3. Neighbours are consulted. If an adjoining owner or occupier objects, the council decides whether the impact on amenity is acceptable.
  4. Wait for the trigger to start. Do not start until the council confirms prior approval is not required, grants prior approval, or 42 days pass without a decision on a valid application.

Even with prior approval, the extension must still meet every other Class A condition (height, materials, side-width rules, and so on). The council can refuse if the proposal is outside permitted development.

Do I need planning permission for an extension?

You usually need a full householder planning application if any of the following apply:

  • Depth beyond PD. Rear projection past 4 m (detached) or 3 m (other) without a valid larger-extension prior approval route, or past 8 m / 6 m in any case.
  • Two-storey rear. Two-storey rear extensions have tighter Class A limits (including a 3 metre rear depth in many cases) and often need planning permission on constrained plots.
  • Side extensions on protected land. Side additions facing a highway, or wrapping side-and-rear “infill” that breaks width or depth tests.
  • Flats, listed buildings, Article 4. Householder PD does not cover flats. Listed buildings need listed building consent. Article 4 directions can remove PD rights street by street.
  • Front elevations and principal elevations. Extensions that go beyond a wall forming a principal or side elevation fronting a highway are tightly restricted.

If you are unsure, apply for a Lawful Development Certificate (proposed). It is optional but useful for buyers and lenders. Building Regulations are separate from planning and still apply to almost every extension.

Height, width and other Class A limits

Depth is only one test. A permitted development extension must also stay within other Class A limits, including:

  • Height. Single-storey enlargements under the rear rules must not exceed 4 metres in height.
  • Eaves and ridge relative to the house. The extension must not be higher than the highest part of the existing house roof, and eaves rules apply where the extension comes within 2 metres of a boundary.
  • Side width. Where a side extension is involved, total width must not exceed more than half the width of the original house.
  • Materials. Exterior materials should be of similar appearance to the existing house (with limited exceptions such as conservatories).
  • Garden coverage. Enlarged parts plus outbuildings must leave enough of the curtilage undeveloped — Class A uses a “more than half the area of the curtilage” test against the original house footprint.

Wrap-around side-and-rear extensions must satisfy both rear and side tests at once. That is a common reason “designs that look like PD” still need planning permission.

Worked example: semi-detached rear extension

Worked example

You own a semi-detached house in England that is not in a conservation area, National Park or SSSI. The original rear wall is intact. You want a single-storey kitchen diner projecting 5.5 metres into the garden, eaves under 3 metres, overall height 3.5 metres, matching brick and roof tiles.

Standard PD allows only 3 metres on a semi. Your 5.5 metre depth sits between 3 and 6 metres, so it can only proceed as permitted development if you use the larger home extension prior approval route and the council’s neighbour consultation does not stop it. If a neighbour objects and the council refuses on amenity grounds, you would need a full planning application (or a redesign).

Answer: 5.5 m on a semi is not automatic PD — use prior approval (up to 6 m) before starting, or apply for planning permission.

Quick depth check
Remaining PD depth = limit (3 m or 4 m, or 6 m / 8 m with prior approval) − existing rear extensions from the original wall

What is not current law

From time to time, government consultations and press coverage float bigger permitted development depths or new householder rights. Unless the change appears in the GPDO on legislation.gov.uk and is reflected in Planning Portal / GOV.UK guidance, treat it as a proposal, not something you can build under today.

As of November 2026, the live Planning Portal guidance still shows the familiar 3 m / 4 m standard rear limits and 6 m / 8 m larger rear extensions with prior approval. Do not assume a bigger limit is already in force because a minister announced an intention or a draft Order was discussed.

Once you know the lawful footprint, size materials and budget with the Home Extension Calculator. For kitchen-specific pricing, see our kitchen extension cost guide; for roof-space alternatives, compare loft conversion types.

Certificates and next steps

A Lawful Development Certificate (proposed) is not mandatory, but it is often worth the fee when you plan to sell or remortgage soon after building. Buyers’ solicitors routinely ask how a deep rear extension was authorised. Prior approval decision notices and Building Control completion certificates should live with your deeds pack.

Sequence the project like this:

  1. Measure from the original rear wall and list any existing extensions.
  2. Check designations — conservation area, listed status, Article 4, SSSI, national park.
  3. Pick the route — standard PD, larger home extension prior approval, or full planning.
  4. Appoint design and structural input before you demolish.
  5. Submit Building Regulations (building notice or full plans) in parallel with planning where needed.

If your goal is an open-plan kitchen, confirm services moves and boiler position while the planning route is still flexible. Depth that is lawful on paper can still be a poor buy if it leaves a useless strip of garden or fails daylight rules on a neighbour’s window — prior approval exists partly to surface those amenity fights early.

Frequently Asked Questions

How big can a permitted development rear extension be?

For a single-storey rear extension under standard permitted development in England: up to 3 metres beyond the original rear wall for terraced and semi-detached houses, or 4 metres for detached houses, and no more than 4 metres high. Larger rear extensions up to 6 metres (other houses) or 8 metres (detached) need prior approval first.

Do I need planning permission for a 5 metre rear extension on a semi?

A 5 metre single-storey rear extension on a semi-detached house is bigger than the 3 metre standard limit, so it is not automatic permitted development. If the house is not on Article 2(3) land or an SSSI, you may still use the larger home extension route up to 6 metres, but you must notify the council and complete prior approval before work starts.

What is larger home extension prior approval?

It is the neighbour consultation process for single-storey rear extensions that go beyond 3 metres (other houses) or 4 metres (detached) up to 6 metres or 8 metres. You apply via the Planning Portal. Work must not start until the council says prior approval is not required, grants approval, or 42 days pass without a decision.

Do flats get permitted development extension rights?

No. Householder permitted development under Class A applies to dwellinghouses, not flats or maisonettes. Listed buildings and many conservation-area cases also lose or restrict these rights. Always check with your local planning authority.

Do I still need Building Regulations approval?

Yes. Permitted development only removes the need for a planning application when the rules are met. Building Regulations approval (structural, thermal, fire, drainage and so on) is separate and still required for most extensions.

Get local quotes

Compare builders once you know whether you need full planning or prior approval.

UK: Checkatrade

Sources

When you are ready to estimate materials or cost for your project, open the Home Extension Calculator and enter your measurements.